LP gas price list
About Leopalace Green LP Gas
Greenhouse gases generated in the entire value chain, including transportation from production to consumption of LP gas, are offset with carbon credits obtained from environmental conservation projects around the world (carbon offset), and use of LP gas. It is an LP gas that can reduce CO2 emissions to virtually zero.
Hokkaido/Tohoku
Hokkaido
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥822/㎥ (Tax included¥904/㎥) |
10.1㎥〜 | ¥781/㎥ (Tax included¥859/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥40/㎥ (Tax included+¥44/㎥) | +¥9/㎥ (Tax included+¥9/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Aomori
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥719/㎥ (Tax included¥790/㎥) |
10.1㎥〜 | ¥697/㎥ (Tax included¥766/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥32/㎥ (Tax included+¥35/㎥) | +¥6/㎥ (Tax included+¥6/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Iwate
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥714/㎥ (Tax included¥785/㎥) |
10.1㎥〜 | ¥693/㎥ (Tax included¥762/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥32/㎥ (Tax included+¥35/㎥) | +¥6/㎥ (Tax included+¥6/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Miyagi
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥587/㎥ (Tax included¥645/㎥) |
10.1㎥〜 | ¥569/㎥ (Tax included¥625/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥32/㎥ (Tax included+¥35/㎥) | +¥6/㎥ (Tax included+¥6/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Akita
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥693/㎥ (Tax included¥762/㎥) |
10.1㎥〜 | ¥672/㎥ (Tax included¥739/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥32/㎥ (Tax included+¥35/㎥) | +¥6/㎥ (Tax included+¥6/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Yamagata
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥692/㎥ (Tax included¥761/㎥) |
10.1㎥〜 | ¥671/㎥ (Tax included¥738/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥32/㎥ (Tax included+¥35/㎥) | +¥6/㎥ (Tax included+¥6/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Fukushima
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥631/㎥ (Tax included¥694/㎥) |
10.1㎥〜 | ¥612/㎥ (Tax included¥673/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥32/㎥ (Tax included+¥35/㎥) | +¥6/㎥ (Tax included+¥6/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Kanto
Ibaraki
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥528/㎥ (Tax included¥580/㎥) |
10.1㎥〜 | ¥512/㎥ (Tax included¥563/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥45/㎥ (Tax included+¥49/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Tochigi
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥516/㎥ (Tax included¥567/㎥) |
10.1㎥〜 | ¥501/㎥ (Tax included¥551/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥45/㎥ (Tax included+¥49/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Gunma
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥519/㎥ (Tax included¥570/㎥) |
10.1㎥〜 | ¥503/㎥ (Tax included¥553/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥45/㎥ (Tax included+¥49/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Saitama
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥521/㎥ (Tax included¥573/㎥) |
10.1㎥〜 | ¥505/㎥ (Tax included¥555/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥45/㎥ (Tax included+¥49/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Chiba
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥536/㎥ (Tax included¥589/㎥) |
10.1㎥〜 | ¥520/㎥ (Tax included¥572/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥45/㎥ (Tax included+¥49/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Tokyo
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥526/㎥ (Tax included¥578/㎥) |
10.1㎥〜 | ¥510/㎥ (Tax included¥561/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥45/㎥ (Tax included+¥49/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Kanagawa
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥564/㎥ (Tax included¥620/㎥) |
10.1㎥〜 | ¥547/㎥ (Tax included¥601/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥45/㎥ (Tax included+¥49/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Koshinetsu
Niigata
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥638/㎥ (Tax included¥701/㎥) |
10.1㎥〜 | ¥619/㎥ (Tax included¥680/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥45/㎥ (Tax included+¥49/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Yamanashi
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥538/㎥ (Tax included¥591/㎥) |
10.1㎥〜 | ¥522/㎥ (Tax included¥574/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥45/㎥ (Tax included+¥49/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Nagano
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥609/㎥ (Tax included¥669/㎥) |
10.1㎥〜 | ¥591/㎥ (Tax included¥650/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥45/㎥ (Tax included+¥49/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Hokuriku
Toyama
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥710/㎥ (Tax included¥781/㎥) |
10.1㎥〜 | ¥689/㎥ (Tax included¥757/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥47/㎥ (Tax included+¥51/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Ishikawa
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥661/㎥ (Tax included¥727/㎥) |
10.1㎥〜 | ¥641/㎥ (Tax included¥705/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥47/㎥ (Tax included+¥51/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Fukui
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥634/㎥ (Tax included¥697/㎥) |
10.1㎥〜 | ¥615/㎥ (Tax included¥676/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥47/㎥ (Tax included+¥51/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Chubu
Gifu
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥594/㎥ (Tax included¥653/㎥) |
10.1㎥〜 | ¥576/㎥ (Tax included¥633/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥47/㎥ (Tax included+¥51/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Shizuoka
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥582/㎥ (Tax included¥640/㎥) |
10.1㎥〜 | ¥565/㎥ (Tax included¥621/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥45/㎥ (Tax included+¥49/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Aichi
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥578/㎥ (Tax included¥635/㎥) |
10.1㎥〜 | ¥561/㎥ (Tax included¥617/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥47/㎥ (Tax included+¥51/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Mie
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥582/㎥ (Tax included¥640/㎥) |
10.1㎥〜 | ¥565/㎥ (Tax included¥621/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥47/㎥ (Tax included+¥51/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Kinki
Shiga
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥582/㎥ (Tax included¥640/㎥) |
10.1㎥〜 | ¥565/㎥ (Tax included¥621/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥24/㎥ (Tax included+¥26/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Kyoto
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥593/㎥ (Tax included¥652/㎥) |
10.1㎥〜 | ¥575/㎥ (Tax included¥632/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥24/㎥ (Tax included+¥26/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Osaka
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥510/㎥ (Tax included¥561/㎥) |
10.1㎥〜 | ¥495/㎥ (Tax included¥544/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥24/㎥ (Tax included+¥26/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Hyogo
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥629/㎥ (Tax included¥691/㎥) |
10.1㎥〜 | ¥610/㎥ (Tax included¥671/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥24/㎥ (Tax included+¥26/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Nara
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥533/㎥ (Tax included¥586/㎥) |
10.1㎥〜 | ¥517/㎥ (Tax included¥568/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥24/㎥ (Tax included+¥26/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Wakayama
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥572/㎥ (Tax included¥629/㎥) |
10.1㎥〜 | ¥555/㎥ (Tax included¥610/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥24/㎥ (Tax included+¥26/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Chugoku/Shikoku
Tottori
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥687/㎥ (Tax included¥755/㎥) |
10.1㎥〜 | ¥666/㎥ (Tax included¥732/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥31/㎥ (Tax included+¥34/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Shimane
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥713/㎥ (Tax included¥784/㎥) |
10.1㎥〜 | ¥692/㎥ (Tax included¥761/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥31/㎥ (Tax included+¥34/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Okayama
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥652/㎥ (Tax included¥717/㎥) |
10.1㎥〜 | ¥632/㎥ (Tax included¥695/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥31/㎥ (Tax included+¥34/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Hiroshima
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥642/㎥ (Tax included¥706/㎥) |
10.1㎥〜 | ¥623/㎥ (Tax included¥685/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥31/㎥ (Tax included+¥34/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Yamaguchi
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥680/㎥ (Tax included¥748/㎥) |
10.1㎥〜 | ¥660/㎥ (Tax included¥726/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥31/㎥ (Tax included+¥34/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Tokushima
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥589/㎥ (Tax included¥647/㎥) |
10.1㎥〜 | ¥571/㎥ (Tax included¥628/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥38/㎥ (Tax included+¥41/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Kagawa
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥602/㎥ (Tax included¥662/㎥) |
10.1㎥〜 | ¥584/㎥ (Tax included¥642/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥38/㎥ (Tax included+¥41/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Ehime
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥601/㎥ (Tax included¥661/㎥) |
10.1㎥〜 | ¥583/㎥ (Tax included¥641/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥38/㎥ (Tax included+¥41/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Kochi
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥568/㎥ (Tax included¥624/㎥) |
10.1㎥〜 | ¥551/㎥ (Tax included¥606/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥38/㎥ (Tax included+¥41/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Kyushu/Okinawa
Fukuoka
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥614/㎥ (Tax included¥675/㎥) |
10.1㎥〜 | ¥596/㎥ (Tax included¥655/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥30/㎥ (Tax included+¥33/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Saga
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥636/㎥ (Tax included¥699/㎥) |
10.1㎥〜 | ¥617/㎥ (Tax included¥678/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥30/㎥ (Tax included+¥33/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Nagasaki
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥622/㎥ (Tax included¥684/㎥) |
10.1㎥〜 | ¥603/㎥ (Tax included¥663/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥30/㎥ (Tax included+¥33/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Kumamoto
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥585/㎥ (Tax included¥643/㎥) |
10.1㎥〜 | ¥567/㎥ (Tax included¥623/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥30/㎥ (Tax included+¥33/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Oita
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥568/㎥ (Tax included¥624/㎥) |
10.1㎥〜 | ¥551/㎥ (Tax included¥606/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥30/㎥ (Tax included+¥33/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Miyazaki
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥594/㎥ (Tax included¥653/㎥) |
10.1㎥〜 | ¥576/㎥ (Tax included¥633/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥30/㎥ (Tax included+¥33/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Kagoshima
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥597/㎥ (Tax included¥656/㎥) |
10.1㎥〜 | ¥579/㎥ (Tax included¥636/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥30/㎥ (Tax included+¥33/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.
Okinawa
Standard fee(Long-Term Plan)
This fee applies to new customers moving into properties where Leopalace Green LP gas has already been supplied.
Basic charge | Pay As You Use charge | |
---|---|---|
¥1,800 (Tax included ¥1,980) | 0.0〜10.0㎥ | ¥617/㎥ (Tax included¥678/㎥) |
10.1㎥〜 | ¥598/㎥ (Tax included¥657/㎥) |
Adjustment Amount(Long-Term Plan)
The adjusted amount per cubic meter based on the raw material cost adjustment system is as follows.
Applicable month | Adjustment Amount | Comparing to last month |
---|---|---|
2024year12month | +¥30/㎥ (Tax included+¥33/㎥) | +¥7/㎥ (Tax included+¥7/㎥) |
- Rates as of January 2023. Please note that the usage rate varies based on the raw material cost adjustment system.